Kitchen Faucet: Repair or Replace? The Years

By DeskTech HQ · · 1 min read

A kitchen faucet that drips can be repaired with a cartridge or replaced. The repair is cheap and buys a short time. The replacement costs more and lasts longer. The question is how many years the new faucet must last to be the cheaper choice.

The steps

  1. Cost per year of the repair = its cost ÷ the years it buys.
  2. Break-even life of the new faucet = its price ÷ the repair’s cost per year.
  3. Compare with how long faucets last in your rentals.
  4. Add the cost of repeat calls to the repair (the cost of turnover).

A worked example

Example (illustrative arithmetic, not quotes or product claims)

A repair costs $25 and buys 2 years, $12.50 a year. A new faucet installed costs $90. Every figure is a made-up round number.

Years the new faucet lasts New faucet cost per year ($90 ÷ years) Repair $12.50 − new faucet
5 $18.00 −$5.50 (repair cheaper)
7.2 $12.50 $0 (break-even)
10 $9.00 +$3.50 (replace cheaper)

The new faucet has to last 7.2 years to match the repair: $90 ÷ $12.50. A good faucet in a rental often does, if the water is not hard and the tenant is careful.

Count the repeat calls. A repair that fails in a year costs another visit, and tenants notice. If the same faucet has been repaired twice, replace it. If it is the first drip and the faucet is new, repair it (a capex reserve by system age).

Making it routine

  1. Log the faucet’s age and repairs at turnover.
  2. Repair the first drip of a young faucet.
  3. Replace after a second repair.
  4. Use a licensed plumber where required.

Run your own numbers

Use the free BRRRR calculator below to see how small yearly costs per unit add up across a building.

Quick answers

How do I compare repair and replacement?

Divide each cost by the years it buys.

What is the break-even life of the new faucet?

Its price divided by the repair's cost per year.

What else counts?

Repeat service calls and tenant complaints.

Does the water supply matter?

Hard water can shorten the life of either choice.

Do the numbers in this guide apply to my rental?

No. The prices and lives are made up for the example. They are not quotes or product claims.

Keep reading

BRRRR

Garbage Disposal: Repair or Replace? The Years

Learn how to compare repairing and replacing a rental garbage disposal by cost per year and find how many years a new unit must last to be the cheaper one.

· 1 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.