Give the Borrower the Draw Inspection Window at Closing
The inspector arrives and the borrower and contractor are out of town. The trip is wasted. A line at closing saying inspections happen within three to five business days of a request takes three minutes. The question is how likely a nobody-was-there visit is for the line to pay.
The steps
- Price the line: minutes × the value of your time.
- Price a nobody-was-there visit: a wasted trip and a repeat visit.
- Break-even chance = line cost ÷ wasted-visit cost.
- Send access details too (text the draw inspector the access details the day before).
A worked example
Example (illustrative arithmetic, not predictions)
The line takes 3 minutes at $60 an hour: $3. A nobody-was-there visit costs $75. Every figure is a made-up round number.
| Chance of a nobody-was-there visit | Expected cost avoided (chance × $75) | Avoided − $3 |
|---|---|---|
| 2% | $1.50 | −$1.50 |
| 4% | $3 | $0 (break-even) |
| 8% | $6 | +$3 |
| 12% | $9 | +$6 |
The line pays at a 4% chance of a nobody-was-there visit: $3 ÷ $75. Across many draws, it is plausible.
Tell the borrower at closing that inspections take place within a stated number of days of a request, ask them to be reachable, and repeat it in the draw approval. Treat the window as an estimate.
Making it routine
- Tell the borrower the inspection window at closing.
- Ask them to be reachable.
- Repeat it in the draw approval.
- Treat the window as an estimate.
Run your own numbers
Use the free fix-and-flip loan sizer below to see how a repeat visit adds to the cost of a rehab loan.