Note How Many Workers Are on Site at Each Inspection

By DeskTech HQ · · 1 min read

Three inspections in a row find an empty house and a finished room. Nobody wrote down that no one was working. The job had stalled for a month. A line in the inspection notes with the head count takes two minutes. The question is how likely an unnoticed stall is for the note to pay.

The steps

  1. Price the note: minutes × the value of your time, per inspection.
  2. Price an unnoticed stall: interest and a late discovery.
  3. Break-even chance = note cost ÷ stall cost.
  4. Use the same inspector (same inspector for every draw on a job).

A worked example

Example (illustrative arithmetic, not predictions)

The note takes 2 minutes at $60 an hour: $2. An unnoticed stall costs $200. Every figure is a made-up round number.

Chance of an unnoticed stall Expected cost avoided (chance × $200) Avoided − $2
0.5% $1 −$1
1% $2 $0 (break-even)
3% $6 +$4
5% $10 +$8

The note pays at a 1% chance of an unnoticed stall: $2 ÷ $200. Across many jobs and draws, it is plausible.

Ask the inspector to note the head count, the trades and what they were doing, and compare it across visits. Treat one empty day as a prompt for a call, not a finding.

Making it routine

  1. Ask the inspector to note the head count and trades.
  2. Compare it across visits.
  3. Treat one empty day as a prompt for a call.
  4. Review how notes are used with a lawyer.

Run your own numbers

Use the free fix-and-flip loan sizer below to see what a stalled month costs in interest on a rehab loan.

Quick answers

What is noted?

The number of people working on the day and the trades.

How do I price it?

The minutes per inspection times the value of your time.

What does an unnoticed stall cost?

Interest while the job sits and a late discovery.

What is the break-even chance?

The note's cost divided by that cost.

Do the numbers in this guide apply to my draws?

No. The time, costs and odds are made up for the example. They are not predictions.