Hollow or Solid-Core Interior Doors: The Years
Hollow-core interior doors are cheap and easy to damage. Solid-core doors cost more and survive more tenants. In a rental, the question is how many years a solid door must last to be the cheaper one.
The steps
- Cost per year of the hollow door = price ÷ life in your rentals.
- Break-even life of the solid door = its price ÷ the hollow door’s cost per year.
- Compare with how long your doors really last (a capex reserve by system age).
A worked example
Example (illustrative arithmetic, not quotes or product claims)
A hollow door costs $55 installed and lasts 8 years in a rental, $6.88 a year. A solid-core door costs $140. Every figure is a made-up round number.
| Years the solid door lasts | Solid cost per year ($140 ÷ years) | Hollow $6.88 − solid |
|---|---|---|
| 15 | $9.33 | −$2.46 (hollow cheaper) |
| 20.4 | $6.88 | $0 (break-even) |
| 25 | $5.60 | +$1.28 (solid cheaper) |
The solid door has to last about twenty years to match a hollow door lasting eight: $140 ÷ $6.88. That is a long time in a rental. On cost alone, hollow doors are usually the cheaper choice.
Other reasons can tip it. Solid doors block sound, which tenants notice, and they resist the holes that tenants and movers put in hollow ones. If your records show hollow doors failing in four years, the break-even falls to ten years. Use your own history (vinyl plank or carpet).
Making it routine
- Record the age and condition of doors at turnover.
- Use fire-rated doors where code requires them.
- Compute the break-even life from your own data.
- Choose by history, not by hope.
Run your own numbers
Use the free BRRRR calculator below to see how a small yearly cost per door adds up across a building.