Leave Ice Melt and a Shovel at Winter Move-In: The Odds
The first freeze comes the week a tenant moves in. The front steps ice over and there is no salt and no shovel in the garage. A kit costs about fifteen dollars and five minutes. The question is how likely an icy-step problem is for the kit to pay.
The steps
- Price the kit: cost + minutes × the value of your time.
- Price an icy-step problem: a complaint, callout or claim.
- Break-even chance = kit cost ÷ problem cost.
- Decide who clears what (snow removal: seasonal contract vs. per visit).
A worked example
Example (illustrative arithmetic, not predictions)
The kit costs $15 plus 5 minutes at $60 an hour ($5): $20. An icy-step problem costs $500 to handle. Every figure is a made-up round number.
| Chance of an icy-step problem | Expected cost avoided (chance × $500) | Avoided − $20 |
|---|---|---|
| 2% | $10 | −$10 |
| 4% | $20 | $0 (break-even) |
| 8% | $40 | +$20 |
| 12% | $60 | +$40 |
The kit pays at a 4% chance of an icy-step problem: $20 ÷ $500. In a cold climate, that is plausible.
Put the kit by the door, say in the lease or a note who clears the steps and walks, and check the lease terms and local rules. Use ice melt as the label directs, and keep it away from pets.
Making it routine
- Put the kit by the door.
- Say who clears steps and walks.
- Check lease terms and local rules.
- Use ice melt as the label directs.
Run your own numbers
Use the free closing net sheet below to see how small turnover costs add up against what you keep at sale.