Loan Approval Memo: A One-Page Record of Why You Lent
Six months after a loan closes, nobody remembers why it looked good. A one-page memo written before closing answers that question, and it makes the decision more careful in the first place.
What goes on the page
- Deal: borrower, property, purpose, loan amount, rate, term, fees.
- Numbers: loan-to-cost, loan-to-value, and the other ratios in your policy (LTV, LTC and ARV).
- Policy checks: each limit, the actual figure and pass or exception (policy manual).
- Borrower: cash, experience, references (verifying cash).
- Risks and offsets: the two or three things most likely to go wrong, and what you did about them (downside test).
- Decision: approve, approve with conditions, or decline, with the date and the person.
A worked example
Example (illustrative arithmetic, not recommended limits)
Purchase $140,000, rehab $50,000, finished value $270,000, as-is value $145,000. Loan: $100,000 at closing plus a $47,000 rehab holdback, $147,000 in all, at 11%. Every figure is a made-up round number.
| Check | Actual | Limit | Result |
|---|---|---|---|
| Total loan ÷ total cost | $147,000 ÷ $190,000 = 77.4% | 85% | Pass |
| Total loan ÷ finished value | $147,000 ÷ $270,000 = 54.4% | 70% | Pass |
| Initial advance ÷ as-is value | $100,000 ÷ $145,000 = 69.0% | 75% | Pass |
| Borrower cash ÷ required cash | $40,000 ÷ $13,085 = 3.06 times | 2 times | Pass |
Required cash is six months of interest on the full loan ($8,085) plus 10% of the rehab ($5,000), $13,085. Main risks: a rehab overrun and a slow sale. Offsets: the holdback is released only against inspected draws, and the borrower’s cash covers about three times the requirement (draws). Decision: approve with conditions. Conditions: insurance in force and a title commitment reviewed before closing (title commitment).
Keeping the habit
- Use the same template for every loan.
- Save the memo in the loan file (loan file checklist).
- Count exceptions each quarter and look at how those loans performed (loan book review).
Run your own numbers
Use the free fix-and-flip loan sizer below to check a loan’s ratios before you write the memo.