The Complete Loan File: A Lender's Checklist
A loan file is the story of a loan, told in documents. A good one answers any question about the loan without anyone having to remember what happened. A poor one makes the lender reconstruct the story, usually at the worst moment.
What belongs in the file
- Request and underwriting. The application, the scorecard or checklist, the value and the exit plan (a pre-funding checklist; borrower scorecard; exit plan review).
- Closing. Signed loan documents, the title commitment and policy, insurance and wire confirmation (title commitment; insurance).
- Budget and draws. The approved budget, each draw request, inspection and payment (budget review; draw requests).
- Servicing. The ledger, notices, late fees and communications (ledger; late payments).
- Changes. Extensions and amendments (extensions).
- Payoff and closeout. The payoff statement, the release and the final ledger (payoff; closeout).
A worked example
Example (illustrative counts, not a standard)
Assume a lender’s checklist has 24 items and audits one file.
| Result | Count | Share of 24 |
|---|---|---|
| Items present and complete | 22 | 22 ÷ 24 = 91.7% |
| Items missing or incomplete | 2 | 2 ÷ 24 = 8.3% |
The two gaps are an unsigned page of the loan agreement and a missing inspection report for the second draw. Both can be fixed now, with the borrower and the inspector. If they were found at payoff, one might be impossible to fix.
How to audit
- Use the same checklist for every loan.
- Audit at closing, after the first draw and at payoff.
- Record what was missing and who fixed it by when.
- Treat a pattern of the same gap as a process problem (policy manual).
Keep it secure
- Limit who can open files and log access.
- Store files in a secure place with backups.
- Share only what is needed, only with who needs it.
- Dispose of records as your policy and the law direct.
Size the next loan
Use the free loan sizer below to compare a new loan with the property’s value, then open its file.