Contractor Concentration: Many Loans, One Builder

By DeskTech HQ · · 2 min read

Nine of your forty loans are being rehabbed by the same crew. The borrowers are different people, the properties are on different streets, and a quick look at your concentration table shows nothing unusual. If that crew stops working, nine jobs stop on the same day.

The steps

  1. Record the contractor on every loan, and update it if the borrower changes crews (vetting the contractor).
  2. Count active loans and balances by contractor each quarter (concentration).
  3. For each contractor, estimate the extra cost and delay if the work stopped.
  4. Multiply by the number of loans and by the chance of failure.
  5. Set a cap and a rule for what happens above it.

A worked example

Example (illustrative arithmetic, not statistics)

A book of 40 loans averaging $120,000, so $4,800,000. If a contractor fails mid-job, assume $24,000 of work remains on each loan and re-bidding costs 25% more ($6,000), and the loan runs two months late, with $1,375 a month of interest at risk ($2,750). That is $8,750 per loan. Assume a 4% chance the contractor fails in a year. Every figure is a made-up round number.

Loans with this contractor Balance Share of the book If it fails (× $8,750) Expected cost (4%)
9 $1,080,000 22.5% $78,750 $3,150
6 $720,000 15.0% $52,500 $2,100
3 $360,000 7.5% $26,250 $1,050

Nine loans on one crew expose $78,750 at once and carry an expected cost of $3,150 a year. A cap of 15%, which is six loans, cuts the exposure to $52,500. The expected cost is small. The event is not: it arrives on nine loans in the same month, when you also have your usual defaults to deal with (in-balance test).

A cap can be softer than a ban. You can require a stronger vetting, such as proof of insurance and references, or a larger holdback, once a contractor passes a threshold (insurance and license check).

Making it routine

  1. Add a contractor field to every loan record and fill it in at the first draw.
  2. Review the count by contractor with the rest of your concentration report.
  3. Write the cap and the extra steps above it in your policy manual.
  4. Apply the cap the same way to every borrower.

Run your own numbers

Use the free fix-and-flip loan sizer below to see the holdbacks that would be left on loans if a crew stopped.

Quick answers

How is this different from borrower concentration?

Borrower concentration counts loans to one borrower. Contractor concentration counts loans whose work depends on one builder, even when the borrowers are different people.

How do I find out?

Ask for the contractor's name on every loan and record it in the loan file. Count loans by contractor each quarter.

What happens when a contractor fails?

Work stops on every job at once. Each one has to be re-bid, usually at a higher price, and each loan may run late.

Should I cap loans by contractor?

Many lenders set a limit, such as a share of the book or a number of active loans. Write the limit down and apply it the same way every time.

Do the numbers in this guide apply to my loans?

No. The loan counts, costs and failure odds are made up for the example. They are not statistics.

Keep reading

Private and hard money lending

Loan-Level Profit: What Each Loan Really Earned

Learn how to compute each private loan's profit after your time, outside costs and cost of capital, and see how one troubled loan changes the book.

· 2 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.