Long-Lead Items: When to Order Before the Work Starts

By DeskTech HQ · · 2 min read

The kitchen install is scheduled for week 5. The cabinets take eight weeks to arrive. If the order goes in after the demolition is finished in week 3, the crew finishes everything else and then waits.

The steps

  1. Mark the long-lead items on your schedule and the week each one is needed (critical path).
  2. Get each lead time, deposit and cancellation term in writing.
  3. For each ordering date, compute the arrival week and the weeks of delay.
  4. Price the delay at your weekly holding cost (holding costs).
  5. Add the expected cost of cancelling if the plan changes, and compare the options.

A worked example

Example (illustrative arithmetic, not supplier terms)

Cabinets cost $7,200 with an 8-week lead time and are needed in week 5. Holding cost is $300 a week. Cancelling an order costs a 25% restocking fee ($1,800). Assumed odds that the order has to be cancelled: 0% if ordered after demolition (scope is certain), 5% if ordered at the start, 25% if ordered before closing (the deal might fall through). Every figure is a made-up round number.

Order placed Arrives Weeks of delay Delay cost Expected cancel cost Total
Week 3, after demolition Week 11 6 $1,800 $0 $1,800
Week 0, at the start Week 8 3 $900 5% × $1,800 = $90 $990
Week −2, before closing Week 6 1 $300 25% × $1,800 = $450 $750

Waiting for certainty is the most expensive choice here: $1,800 against $750. Ordering before closing is the cheapest on paper, but the $450 is an expected cost, and the real outcome is either nothing or a $1,800 loss, and the deposit may be at risk too (buying materials early).

The middle option is a reasonable default: order at the start, once the scope is signed, and pick items you are confident about. If you can change only the installation week, a schedule buffer may absorb part of the delay (schedule buffer).

Making it routine

  1. List long-lead items on the scope of work with their lead times (scope of work).
  2. Order as soon as the scope for that item is final.
  3. Get deposits, cancellation terms and delivery dates in writing.
  4. Record actual lead times so your next schedule uses real numbers.

Run your own numbers

Use the free holding cost calculator below to price each week an item delays the job.

Quick answers

What is a long-lead item?

Something that takes weeks to arrive after you order it, such as custom cabinets, windows or special doors. If it arrives after the crew needs it, the schedule waits.

How do I know a lead time?

Ask the supplier in writing for the lead time and what could extend it. Treat any quote as a best case and add a margin.

Why not order everything on day one?

Because an order made before the scope is settled can be wrong, and cancelling or returning may cost a deposit or restocking fee.

What if the purchase has not closed yet?

Ordering before closing puts money at risk if the deal falls through. If you do it, know what is refundable and what is not, and ask your attorney about the contract.

Do the numbers in this guide apply to my project?

No. The lead times, costs and odds are made up for the example. They are not supplier quotes or advice about any project.

Keep reading

Flip project management

Rehab Schedule Basics: Find the Critical Path

Learn how to build a rehab schedule, find the chain of tasks that sets the finish date, and see which delays cost real time, with a worked example.

· 2 min read