Mobilization Fee: The Job Size Where It Stops Mattering

By DeskTech HQ · · 1 min read

Some contractors charge a fixed fee to start a job, whatever its size. On a large rehab it barely registers. On a small repair it can be a big part of the bill. The question is where the line sits.

The steps

  1. Take the fee and the bid.
  2. Fee share = fee ÷ bid.
  3. Pick the share at which you stop caring, such as 5%, and find the job size: fee ÷ that share.
  4. Bundle small jobs below that size (the contractor deposit).

A worked example

Example (illustrative arithmetic, not quotes)

The mobilization fee is $1,500. Every figure is a made-up round number.

Job size Fee as a share of the job
$10,000 15%
$30,000 5%
$100,000 1.5%

The fee drops to 5% of the bid at $30,000: $1,500 ÷ 0.05. Below that, it is worth asking whether the fee is negotiable, or whether a bundle of small jobs would spread it.

A flat fee also changes the economics of doing work in stages. Three separate $10,000 jobs from the same contractor pay the fee three times, $4,500. One $30,000 job pays it once. That is a reason to plan the scope and order work together (comparing contractor bids).

Making it routine

  1. Ask each bidder whether a start-up fee applies.
  2. Compare bids with the fee included.
  3. Bundle small jobs with one contractor.
  4. Put the fee in the written contract.

Run your own numbers

Use the free holding cost calculator below to see what a stalled start costs each day.

Quick answers

What is a mobilization fee?

A fixed charge for getting a crew, equipment and permits to the site.

When does it matter?

On small jobs, where it is a large share of the bid.

Can I negotiate it?

Sometimes, especially if you bundle jobs.

Are fees like this limited?

Some states limit deposits and upfront charges. Check.

Do the numbers in this guide apply to my project?

No. The fee and job sizes are made up for the example. They are not quotes.

Keep reading

Flip project management

Daily Site Log: The Dispute Odds That Pay

Learn how to find the chance of a contractor dispute that makes ten minutes a day on a site log over a 60-day rehab worth the time it takes.

· 1 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.