Post-Sale Callback Reserve: Cash to Hold After Closing

By DeskTech HQ · · 2 min read

The flip sold, the funds arrived, and the next deal is waiting. Three weeks later the buyer calls about a leaking fixture. Whether you owe anything depends on the contract and the law. Having cash ready for the calls you decide to handle is a separate question.

The steps

  1. List your last several sales and the cost of any post-closing callback on each, including zero.
  2. Compute the average cost per sale and note the largest.
  3. Pick a reserve that covers the typical sale comfortably and most of the bad ones.
  4. Hold it as cash, outside the money for the next deal, for a set period.
  5. Release what is unused when the period ends (cash reserve for a flip).

A worked example

Example (illustrative arithmetic, not statistics)

Ten past sales. Seven had no callback cost. The other three cost $250, $1,200 and $2,500. Every figure is a made-up round number.

Total: $250 + $1,200 + $2,500 = $3,950. Average per sale: $3,950 ÷ 10 = $395.

Reserve per sale Sales it fully covers (of 10) Left uncovered
$395 (the average) 8 $805 on one sale, $2,105 on another
$1,200 9 $1,300 on one sale
$2,500 10 none

An average-sized reserve covers 8 of 10 sales but leaves a gap on the two worst. A $1,200 reserve covers 9. A $2,500 reserve covers all ten but ties up cash on every sale. If you hold reserves across several flips at once, the pooled amount can be smaller than the sum, because the bad cases rarely arrive together (cash reserve for a flip).

This is a record of ten sales, so it is a small sample. Add each new sale to it and re-run the table. A change in your process, such as a final walk-through that catches more, changes the numbers (punch list and closeout).

Making it routine

  1. Record the callback cost on every sale, including zero.
  2. Set the reserve from the record.
  3. Keep it in a separate account for a set period.
  4. Ask an attorney what you owe, and put that in the contract.

Run your own numbers

Use the free closing net sheet below to see what you walk away with, and what you set aside from it (closing net sheet).

Quick answers

What is a callback reserve?

Cash you keep available after a flip sells, to handle problems a buyer raises in the weeks after closing.

How big should it be?

Look at the callback costs on your past sales. The average shows the typical cost and the worst cases show how much you may need.

Do I owe the buyer repairs after closing?

It depends on your contract, disclosures and state law. Ask a qualified attorney. This guide is about cash planning, not about what you owe.

Why not just count the callbacks in the rehab budget?

They happen after the sale, when the profit is already in your hands and tempting to spend.

Do the numbers in this guide apply to my flips?

No. The callback costs are made up for the example. They are not statistics.

Keep reading

Flip project management

Budget Check Frequency: Weekly or Monthly?

Learn how to compare the extra time a weekly rehab budget check takes with the overrun it can catch weeks sooner, and the odds that make weekly worthwhile.

· 2 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.