Pour Water Down Every Floor Drain at Turnover: The Odds
A basement floor drain has not seen water in a year. The trap has dried out and sewer gas comes up into the house. The tenant calls. A jug of water down each drain takes two minutes. The question is how likely a sewer-smell call is for the step to pay.
The steps
- Price the step: minutes × the value of your time.
- Price a sewer-smell call: a visit to find the cause.
- Break-even chance = step cost ÷ call cost.
- Check the sump too (pour water into the sump pit).
A worked example
Example (illustrative arithmetic, not predictions)
The step takes 2 minutes at $60 an hour: $2. A sewer-smell call costs $80. Every figure is a made-up round number.
| Chance of a sewer-smell call | Expected cost avoided (chance × $80) | Avoided − $2 |
|---|---|---|
| 1.25% | $1 | −$1 |
| 2.5% | $2 | $0 (break-even) |
| 5% | $4 | +$2 |
| 10% | $8 | +$6 |
The step pays at a 2.5% chance of a sewer-smell call: $2 ÷ $80. In a house with a basement drain and a long vacancy, it is plausible.
Pour a quart or two of water into every floor drain, sink and tub, then sniff. If the smell comes back, call a qualified plumber. If you smell gas, leave and call the gas company.
Making it routine
- Pour water into every floor drain, sink and tub.
- Sniff for odor afterward.
- Call a plumber if the smell returns.
- If you smell gas, leave and call the gas company.
Run your own numbers
Use the free closing net sheet below to see how small turnover costs add up against what you keep at sale.