Preheat the Oven and Test Every Burner at Turnover

By DeskTech HQ · · 1 min read

A tenant moves in, turns on the oven and one burner never heats. The first call of the lease is a repair call. A preheat and a test of every burner at turnover takes eight minutes. The question is how likely a first-week appliance callout is for the test to pay.

The steps

  1. Price the test: minutes × the value of your time.
  2. Price a first-week callout: a repair visit.
  3. Break-even chance = test cost ÷ callout cost.
  4. Pair it with the fridge (clean the refrigerator coils and drip pan).

A worked example

Example (illustrative arithmetic, not predictions)

The test takes 8 minutes at $60 an hour: $8. A first-week callout costs $80. Every figure is a made-up round number.

Chance of a first-week appliance callout Expected cost avoided (chance × $80) Avoided − $8
5% $4 −$4
10% $8 $0 (break-even)
20% $16 +$8
30% $24 +$16

The test pays at a 10% chance of a first-week callout: $8 ÷ $80. With an older range, that is plausible.

Preheat the oven and check that it reaches temperature, run every burner and the oven light and clock, and note anything that fails. If you smell gas, leave and call the gas company.

Making it routine

  1. Preheat the oven.
  2. Run every burner.
  3. Check the light and clock.
  4. Note failures and repair before move-in.

Run your own numbers

Use the free closing net sheet below to see how small turnover costs add up against what you keep at sale.

Quick answers

What does the test involve?

Preheating the oven, lighting or heating each burner and checking the clock and light.

How do I price it?

The minutes times the value of your time.

What does a first-week callout cost?

A repair visit and an unhappy tenant.

What is the break-even chance?

The test's cost divided by the callout cost.

Do the numbers in this guide apply to my rental?

No. The costs and odds are made up for the example. They are not predictions.

Keep reading

Rehab budgeting

Add a Final Cleaning Line to the Rehab Budget

Learn how to price adding a final cleaning line to the rehab budget and find the forgotten-clean chance at which three minutes of work pays for itself.

· 1 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.