Prime Ceiling Water Stains With Stain Blocker: The Odds

By DeskTech HQ · · 1 min read

A brown ring on the ceiling is painted over with ordinary white. A month later the ring is back. Stain-blocking primer costs about fifteen dollars and ten minutes of extra work. The question is how likely bleed-through is for the primer to pay.

The steps

  1. Price the primer: primer + minutes × the value of your time.
  2. Price bleed-through: a second coat or a repaint.
  3. Break-even chance = primer cost ÷ repaint cost.
  4. Find the source first (check the attic for leak stains at turnover).

A worked example

Example (illustrative arithmetic, not predictions)

The primer costs $15 plus 10 minutes at $60 an hour ($10): $25. A bleed-through repaint costs $200. Every figure is a made-up round number.

Chance of stain bleed-through Expected cost avoided (chance × $200) Avoided − $25
6.25% $12.50 −$12.50
12.5% $25 $0 (break-even)
25% $50 +$25
40% $80 +$55

The primer pays at a 12.5% chance of bleed-through: $25 ÷ $200. With an old stain under ordinary paint, it is likely.

Fix the leak, let the area dry, scrub loose material, spot-prime the stain beyond its edges and then paint. Ventilate the room while the primer dries.

Making it routine

  1. Fix the leak and let the area dry.
  2. Scrub loose material.
  3. Spot-prime past the edges of the stain.
  4. Ventilate while it dries.

Run your own numbers

Use the free closing net sheet below to see how small turnover costs add up against what you keep at sale.

Quick answers

Why prime a stain?

Ordinary paint lets old stains show through again.

How do I price the primer?

The primer plus the extra minutes to spot-coat the stains.

What does bleed-through cost?

A second coat or a repaint of the ceiling.

What is the break-even chance?

The primer's cost divided by the repaint cost.

Do the numbers in this guide apply to my rental?

No. The costs and odds are made up for the example. They are not predictions.

Keep reading

Rehab budgeting

Add a Final Cleaning Line to the Rehab Budget

Learn how to price adding a final cleaning line to the rehab budget and find the forgotten-clean chance at which three minutes of work pays for itself.

· 1 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.