Probe Exterior Wood for Rot at Turnover: The Odds
Rot starts small, behind paint, and spreads where water sits. A screwdriver pushed into a window sill or a stair tread tells you in seconds whether the wood is soft. Walking the exterior takes ten minutes at turnover. The question is how likely an early catch is for the probe to pay.
The steps
- Price the probe: minutes × the value of your time.
- Estimate the extra repair cost avoided by catching rot early.
- Break-even chance = probe cost ÷ extra cost avoided.
- Fix structural items with a qualified contractor (exterior paint: spot prep or repaint).
A worked example
Example (illustrative arithmetic, not quotes or predictions)
The probe takes 10 minutes at $60 an hour: $10. Catching rot early saves $400 over finding it late. Every figure is a made-up round number.
| Chance the probe finds rot early | Expected saving (chance × $400) | Saving − $10 |
|---|---|---|
| 1% | $4 | −$6 |
| 2.5% | $10 | $0 (break-even) |
| 5% | $20 | +$10 |
| 10% | $40 | +$30 |
The probe pays at a 2.5% chance of an early catch: $10 ÷ $400. On an older house with painted wood near the ground, the chance is much higher.
Push a screwdriver into sills, frames, trim, deck posts and stair treads, especially where water sits. Soft wood is a sign to call a contractor. Treat soft stairs, railings and deck framing as a safety matter and keep tenants off them until they are fixed.
Making it routine
- Walk the exterior at every turnover.
- Probe sills, frames, trim, posts and treads.
- Mark soft spots and photograph them.
- Call a contractor for anything structural.
Run your own numbers
Use the free BRRRR calculator below to see how a repair found early or late changes a rental’s cash flow.