Put a Drip Pan and Drain Line Under the Water Heater

By DeskTech HQ · · 2 min read

An old water heater weeps slowly for months. The water soaks the closet floor and the wall behind it before anyone sees it. A drip pan with a drain line costs about twenty dollars and ten minutes of a plumber’s time to check. The question is how likely a slow tank leak is for the pan to pay.

The steps

  1. Price the pan: pan and fittings + minutes × the value of your time.
  2. Price a slow tank leak: floor damage and a replacement heater.
  3. Break-even chance = pan cost ÷ damage cost.
  4. Plan the replacement (water heater at year 10: replace early or run to failure).

A worked example

Example (illustrative arithmetic, not predictions)

The pan costs $20 plus 10 minutes at $60 an hour ($10): $30. Slow-leak damage costs $1,500 to repair. Every figure is a made-up round number.

Chance of a slow tank leak Expected cost avoided (chance × $1,500) Avoided − $30
1% $15 −$15
2% $30 $0 (break-even)
4% $60 +$30
6% $90 +$60

The pan pays at a 2% chance of a slow tank leak: $30 ÷ $1,500. For a heater past its tenth year, it is plausible.

Check whether a pan and a drain line are already there, fit a pan sized to the tank with a line that runs to a safe drain, and have a plumber check the relief valve line. Replace a heater that is leaking.

Making it routine

  1. Check whether a pan and drain line are already there.
  2. Fit a pan sized to the tank.
  3. Run the line to a safe drain.
  4. Have a plumber check the relief valve line.

Run your own numbers

Use the free closing net sheet below to see how small upkeep costs add up against what you keep at sale.

Quick answers

What does a drip pan do?

It catches a slow leak and sends it to a drain instead of the floor.

How do I price it?

The pan and fittings plus the minutes to fit them.

What does a slow tank leak cost?

Floor damage, a flooded closet or basement and a new heater.

What is the break-even chance?

The pan's cost divided by the damage cost.

Do the numbers in this guide apply to my rental?

No. The costs and odds are made up for the example. They are not predictions.

Keep reading

Rehab budgeting

Add a Final Cleaning Line to the Rehab Budget

Learn how to price adding a final cleaning line to the rehab budget and find the forgotten-clean chance at which three minutes of work pays for itself.

· 1 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.