Put a Leak Sensor Under the Kitchen Sink: The Odds
A small drip under the sink runs for weeks behind a closed cabinet door. By the time anyone notices, the cabinet floor is soft. A battery sensor costs about twenty dollars and five minutes. The question is how likely a slow leak is for the sensor to pay.
The steps
- Price the sensor: cost + minutes × the value of your time.
- Price a slow leak found late: damage and a repair visit.
- Break-even chance = setup cost ÷ leak cost.
- Pair it with a drain pan and shutoff (washer drain pan and auto-shutoff).
A worked example
Example (illustrative arithmetic, not predictions)
The sensor costs $20 plus 5 minutes at $60 an hour ($5): $25. A slow leak found late costs $500. Every figure is a made-up round number.
| Chance of a slow leak under the sink | Expected cost avoided (chance × $500) | Avoided − $25 |
|---|---|---|
| 2.5% | $12.50 | −$12.50 |
| 5% | $25 | $0 (break-even) |
| 10% | $50 | +$25 |
| 15% | $75 | +$50 |
The sensor pays at a 5% chance of a slow leak: $25 ÷ $500. Over a long hold, it is plausible.
Place it flat under the sink, test it with a damp finger, write the battery date on it and tell the tenant what the alarm means. It does not stop a leak, so someone has to act on it.
Making it routine
- Place it flat under the sink.
- Test it with a damp finger.
- Write the battery date on it.
- Tell the tenant what the alarm means.
Run your own numbers
Use the free closing net sheet below to see how small turnover costs add up against what you keep at sale.