Put Hair Catchers in the Shower Drains: The Clog-Call Odds

By DeskTech HQ · · 1 min read

A shower drain packs with hair over a few months. The tenant calls and a visit clears it. A hair catcher costs a few dollars and takes a minute to place. The question is how likely a clog call is for the catcher to pay.

The steps

  1. Price the catcher: cost + minutes × the value of your time.
  2. Price a clog call: a visit to clear the drain.
  3. Break-even chance = setup cost ÷ call cost.
  4. Pair it with the plunger (leave a plunger and toilet brush at move-in).

A worked example

Example (illustrative arithmetic, not predictions)

The catcher costs $4 plus 1 minute at $60 an hour ($1): $5. A clog call costs $100. Every figure is a made-up round number.

Chance of a clog call Expected cost avoided (chance × $100) Avoided − $5
2.5% $2.50 −$2.50
5% $5 $0 (break-even)
10% $10 +$5
20% $20 +$15

The catcher pays at a 5% chance of a clog call: $5 ÷ $100. With long-haired tenants, it is likely.

Clear the drains first, fit a catcher in each and tell the tenant to empty it. If the drain is already slow, look at the line rather than relying on the catcher.

Making it routine

  1. Clear the drains first.
  2. Fit a catcher in each.
  3. Tell the tenant to empty it.
  4. Look at the line if a drain stays slow.

Run your own numbers

Use the free BRRRR calculator below to see how avoided calls add up across a hold.

Quick answers

What does a hair catcher do?

It stops hair before it packs the drain.

How do I price it?

The catcher plus the minutes to place it.

What does a clog call cost?

A plumber or handyman visit to clear the drain.

What is the break-even chance?

The setup cost divided by the call cost.

Do the numbers in this guide apply to my rental?

No. The costs and odds are made up for the example. They are not predictions.

Keep reading

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.