Remote Walkthrough Video: The Screen-Out Share It Needs

By DeskTech HQ · · 1 min read

A trip to see a property costs time and fuel. A remote walkthrough video costs a fee. If the video rules out properties you would otherwise have driven to, it saves the trip. The question is how many it has to rule out.

The steps

  1. Cost a trip: time, fuel and other costs.
  2. Cost a video.
  3. Break-even screen-out share = video cost ÷ trip cost.
  4. Estimate how many of your leads a video would rule out (site visits: your own drive or a local inspector).

A worked example

Example (illustrative arithmetic, not predictions)

A trip costs $90. A video costs $75. Every figure is a made-up round number.

Share of properties the video rules out Trips saved (share × $90) Saved − $75
40% $36 −$39
83.3% $75 $0 (break-even)
100% $90 +$15

A video has to rule out more than five in six properties to pay for itself against a $90 trip: $75 ÷ $90. That is a high bar, so for nearby properties the trip is the better screen.

The math changes with distance. If a trip costs $400 because the property is far away, the break-even share falls to 19%: $75 ÷ $400. For out-of-area deals, a video is a cheap first filter, and an inspector or agent is the next step before you commit (a pre-offer contractor walk-through).

Making it routine

  1. Cost your trips honestly, including time.
  2. Use video for far-away leads.
  3. Compute the break-even share.
  4. Get permission before anyone enters a property.

Run your own numbers

Use the free MAO calculator below to see the price your numbers support before you spend on a visit.

Quick answers

What is the break-even share?

The video's cost divided by the cost of a site visit.

What does a video replace?

A trip you would have made to a property that turns out not to work.

Who films it?

A local agent or helper with permission to enter.

Can a video replace a visit?

For screening, yes. Before buying, you or your inspector should still see it.

Do the numbers in this guide apply to my deals?

No. The costs and shares are made up for the example. They are not predictions.

Keep reading

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.