Site Visits: Your Own Drive or a Local Inspector?

By DeskTech HQ · · 2 min read

A lender with a loan 25 miles away drives out to check each draw. A lender with one 250 miles away probably hires someone local. Somewhere in between, the two cost the same. The question is where.

The steps

  1. Value your time per hour and note the mileage rate you use.
  2. Estimate average speed, to turn distance into hours.
  3. Compute the cost of one round trip at a given distance: time plus mileage.
  4. Compare with the local inspector’s fee for one visit.
  5. Find the distance where they are equal (draw inspections).

A worked example

Example (illustrative arithmetic, not quotes)

Your time is worth $60 an hour, mileage costs $0.70 a mile, and you average 40 miles an hour. A local inspector charges $150 a visit. For a property d miles away, the round trip is 2d miles. Every figure is a made-up round number.

Time: 2d ÷ 40 = d ÷ 20 hours, which costs $60 × d ÷ 20 = $3d. Mileage: 2d × $0.70 = $1.40d. Total: $4.40 per mile of distance.

Distance (one way) Your round trip ($4.40 × d) Local inspector Cheaper
20 miles $88 $150 You
34 miles $150 $150 Equal
80 miles $352 $150 Inspector
Break-even $150 ÷ $4.40 = 34 miles

Beyond about 34 miles, a local inspector costs less than your own drive. Over a loan with six draws, the gap at 80 miles is ($352 − $150) × 6 = $1,212. That is real money on a single loan, and it argues for building a list of trusted local inspectors in the areas you lend.

The arithmetic leaves out quality. An inspector who does not know what to look for, or who is not independent of the borrower, is worth less than the fee. Hire in writing, ask for photos with a standard checklist, and visit yourself when the draw is large or a report raises a question (lender site visit report).

Making it routine

  1. Keep a short list of vetted inspectors by area.
  2. Use the same checklist and photo requirements for each.
  3. Review the first reports from any new inspector closely.
  4. Visit in person for the largest draws and the first draw on a new project.

Run your own numbers

Use the free fix-and-flip loan sizer below to see how many draws a holdback creates, and so how many visits.

Quick answers

When does a local inspector cost less than going yourself?

Past the distance at which your travel time and mileage exceed the inspector's fee. The example shows how to find it.

What does the arithmetic leave out?

The inspector's skill and independence, the quality of the report, and your own knowledge of the property from seeing it.

Should I use an inspector I have not vetted?

Use a written agreement, confirm licensing and insurance where they apply, and review the first few reports closely.

Can a lender rely on a borrower's photos instead?

Sometimes for small draws, with other checks. For large draws, an independent look is safer.

Do the numbers in this guide apply to my loans?

No. The hourly value, mileage rate and fee are made up for the example. They are not quotes.

Keep reading

Draw management

A Better Draw Request Form: Payback on Time Saved

Learn how to price the time a clearer draw request form saves by cutting returned and incomplete requests, and how many months it takes to pay for itself.

· 2 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.