Re-Key the Mailbox at Turnover: The Complaint Odds
A tenant moves out and keeps a mailbox key. The next tenant’s mail is exposed, and the complaint reaches you. Re-keying the lock takes a couple of minutes. The question is how likely a complaint is for the work to pay.
The steps
- Price the work: the cylinder or lock plus minutes of work.
- Price a complaint: the call, the trip and any lost goodwill.
- Break-even chance = work cost ÷ complaint cost.
- Check who controls the mailbox first (the cost of turnover).
A worked example
Example (illustrative arithmetic, not quotes or predictions)
The work costs $6 in a cylinder and time. A complaint would cost $150. Every figure is a made-up round number.
| Chance of a complaint without the work | Expected complaint cost avoided (chance × $150) | Avoided − $6 |
|---|---|---|
| 2% | $3.00 | −$3.00 |
| 4% | $6.00 | $0 (break-even) |
| 8% | $12.00 | +$6.00 |
| 15% | $22.50 | +$16.50 |
Re-keying pays at a 4% chance of a complaint: $6 ÷ $150. Mail theft and misdelivery worry tenants, so the chance is likely higher.
If the mailbox is a postal cluster unit or belongs to the association, ask the postal service or the association; do not change the lock yourself. Handle the lock and keys the same way you handle the door keys (keyless locks vs re-keying).
Making it routine
- Find out who controls the mailbox.
- Re-key at every turnover if it is yours.
- Count and record the keys you hand over.
- Log the date.
Run your own numbers
Use the free BRRRR calculator below to see how a small yearly cost per unit adds up across a building.