Replace the Range Hood Filter at Turnover: The Odds
An old filter is thick with grease. The kitchen smells, the hood drips and a new tenant calls. A new filter costs about fifteen dollars and five minutes. The question is how likely a grease or odor call is for the replacement to pay.
The steps
- Price the filter: cost + minutes × the value of your time.
- Price a grease or odor call: a visit to clean or replace parts.
- Break-even chance = setup cost ÷ call cost.
- Pair it with other kitchen items (clean the refrigerator coils and drip pan at turnover).
A worked example
Example (illustrative arithmetic, not predictions)
The filter costs $15 plus 5 minutes at $60 an hour ($5): $20. A grease or odor call costs $80 to handle. Every figure is a made-up round number.
| Chance of a grease or odor call | Expected cost avoided (chance × $80) | Avoided − $20 |
|---|---|---|
| 10% | $8 | −$12 |
| 25% | $20 | $0 (break-even) |
| 40% | $32 | +$12 |
| 60% | $48 | +$28 |
The filter pays at a 25% chance of a grease or odor call: $20 ÷ $80. With a greasy old filter, that is plausible.
Check the model and type of the hood, buy the matching filter and fit it with the power off. Check that air moves out and that the duct is not coated in grease.
Making it routine
- Check the hood model and venting type.
- Buy the matching filter.
- Fit it with the power off.
- Check that air moves out.
Run your own numbers
Use the free closing net sheet below to see how small turnover costs add up against what you keep at sale.