Replace the Fridge Water Line: The Leak Odds

By DeskTech HQ · · 1 min read

A slow leak from a fridge water line can run for weeks behind the appliance and ruin a floor. A braided line costs a few dollars and fits in minutes. The question is how likely a leak is, in a year, for the swap to pay.

The steps

  1. Price the swap: the line plus minutes to fit it.
  2. Estimate the damage a leak would cause: floor, cabinet and mold work.
  3. Break-even chance = swap cost ÷ damage avoided.
  4. Compare with the age of the line and the fridge (washer drain pan and shutoff).

A worked example

Example (illustrative arithmetic, not quotes or predictions)

The swap costs $15 in a braided line and time. A leak would cause $2,500 of damage. Every figure is a made-up round number.

Yearly chance of a line leak Expected damage avoided (chance × $2,500) Avoided − $15
0.3% $7.50 −$7.50
0.6% $15.00 $0 (break-even)
2% $50.00 +$35.00
5% $125.00 +$110.00

The swap pays at a 0.6% yearly chance of a leak: $15 ÷ $2,500. An old plastic line behind a fridge that has been moved is likely above that.

Pull the fridge out at turnover, check the line and the floor behind it, and replace the line if it is plastic, kinked or more than a few years old. Fit a shutoff valve if there is none, and use a licensed plumber where required.

Making it routine

  1. Pull the fridge out at turnover.
  2. Check the line and the floor behind it.
  3. Replace old or plastic lines with braided ones.
  4. Use a licensed plumber where required.

Run your own numbers

Use the free BRRRR calculator below to see how a water damage claim changes a rental’s yearly cash flow.

Quick answers

Why replace the line?

Old plastic or copper lines can crack or loosen and leak behind the fridge.

How do I price it?

The braided line plus the minutes to fit it.

What is the break-even chance?

The cost divided by the damage a leak would cause.

Does every unit have one?

Only units with an ice maker or water dispenser.

Do the numbers in this guide apply to my rental?

No. The cost, damage and odds are made up for the example. They are not quotes or predictions.

Keep reading

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.