Replace Washer Hoses With Braided Ones: The Burst Odds

By DeskTech HQ · · 1 min read

A rubber washer hose has been under pressure for ten years. One day it splits while nobody is home. Two braided hoses cost about twenty dollars and ten minutes to fit. The question is how likely a burst is for the swap to pay.

The steps

  1. Price the swap: hoses + minutes × the value of your time.
  2. Price a burst: water damage, cleanup and repairs.
  3. Break-even chance = swap cost ÷ burst cost.
  4. Pair it with a drain pan (washer drain pan and auto-shutoff).

A worked example

Example (illustrative arithmetic, not predictions)

Two hoses cost $20 plus 10 minutes at $60 an hour ($10): $30. A burst costs $1,500 to clean and repair. Every figure is a made-up round number.

Chance of a burst hose Expected cost avoided (chance × $1,500) Avoided − $30
1% $15 −$15
2% $30 $0 (break-even)
4% $60 +$30
6% $90 +$60

The swap pays at a 2% chance of a burst: $30 ÷ $1,500. With old hoses on an unattended machine, it is plausible.

Shut off both valves, replace the hoses, hand-tighten and add a quarter turn, then check for drips. Write the date on the hoses and replace them again on the maker’s schedule.

Making it routine

  1. Shut off both supply valves.
  2. Fit new hoses and check for drips.
  3. Write the date on the hoses.
  4. Replace them on the maker’s schedule.

Run your own numbers

Use the free closing net sheet below to see how small turnover costs add up against what you keep at sale.

Quick answers

Why replace washer hoses?

Old rubber hoses can crack or bulge and burst under pressure.

How do I price it?

The hoses plus the minutes to fit them.

What does a burst cost?

Water damage, cleanup and repairs.

What is the break-even chance?

The setup cost divided by the burst cost.

Do the numbers in this guide apply to my rental?

No. The costs and odds are made up for the example. They are not predictions.

Keep reading

Rehab budgeting

Add a Final Cleaning Line to the Rehab Budget

Learn how to price adding a final cleaning line to the rehab budget and find the forgotten-clean chance at which three minutes of work pays for itself.

· 1 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.