Run the Dishwasher and Disposal Through a Cycle at Turnover
A dishwasher can look fine and fail to drain. A disposal can hum without turning. Neither shows itself until it is used. Running a cycle at turnover takes five minutes. The question is how likely a failure is for the test to pay.
The steps
- Price the test: minutes × the value of your time.
- Price a failure call: the call, the repair or replacement and goodwill.
- Break-even chance = test cost ÷ call cost.
- Compare with the age of the appliances (appliances for a rental: new or used).
A worked example
Example (illustrative arithmetic, not quotes or predictions)
The test takes 5 minutes at $60 an hour: $5. A failure call would cost $200. Every figure is a made-up round number.
| Chance an appliance fails in the first months | Expected call cost avoided (chance × $200) | Avoided − $5 |
|---|---|---|
| 1% | $2 | −$3 |
| 2.5% | $5 | $0 (break-even) |
| 5% | $10 | +$5 |
| 10% | $20 | +$15 |
The test pays at a 2.5% chance of a failure: $5 ÷ $200. For appliances of unknown age, it is likely higher.
Run a full cycle on the dishwasher, then check that it drained and the door seal is dry and there is no water under the sink. Run the disposal with water and a little ice and listen. Fix or replace anything that fails before the tenant arrives.
Making it routine
- Run a full dishwasher cycle at turnover.
- Check for standing water and leaks.
- Run the disposal with water and listen.
- Fix or replace failures before move-in.
Run your own numbers
Use the free BRRRR calculator below to see how an appliance replacement changes a rental’s yearly cash flow.