Seal Pipe Gaps Under Sinks at Turnover: The Pest Odds

By DeskTech HQ · · 1 min read

Under every sink, the pipe goes through the wall in a hole bigger than the pipe. Mice and insects use it. Sealing the gap takes a few minutes and a tube of sealant. The question is how likely a pest call is, in the first year, for the job to pay.

The steps

  1. Price the job: the sealant or mesh plus the minutes.
  2. Price a pest call: the call, the treatment and goodwill.
  3. Break-even chance = job cost ÷ call cost.
  4. Compare with your pest plan (pest control: annual plan or per treatment).

A worked example

Example (illustrative arithmetic, not quotes or predictions)

The job costs $6 with time. A pest call would cost $120. Every figure is a made-up round number.

Chance of a pest call in the first year Expected call cost avoided (chance × $120) Avoided − $6
2.5% $3 −$3
5% $6 $0 (break-even)
10% $12 +$6
20% $24 +$18

The job pays at a 5% chance of a pest call: $6 ÷ $120. In an older building with gaps around every pipe, the chance is higher.

Look under each sink and behind the toilet and the water heater for gaps around pipes and wires. Fill small gaps with caulk and larger ones with coarse steel wool or metal mesh and then caulk. Fix the source of any moisture or crumbs that attract pests.

Making it routine

  1. Check under each sink and around pipes.
  2. Seal small gaps with caulk.
  3. Pack larger gaps with mesh or steel wool.
  4. Fix moisture and food sources.

Run your own numbers

Use the free BRRRR calculator below to see how a small yearly cost per unit adds up across a building.

Quick answers

Why seal pipe gaps?

Gaps around pipes are doorways for mice and insects.

How do I price the job?

The sealant or wool plus the minutes.

What is the break-even chance?

The cost divided by the cost of a pest call.

What materials work?

Caulk for small gaps and coarse steel wool or mesh for larger ones.

Do the numbers in this guide apply to my rental?

No. The cost and odds are made up for the example. They are not quotes or predictions.

Keep reading

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.