Test the Fridge Door Seal With a Paper Strip at Turnover

By DeskTech HQ · · 1 min read

A tenant stocks the refrigerator and finds it lukewarm the next morning. The door seal has a gap along the bottom. A paper strip test of the door seal at turnover takes three minutes. The question is how likely a warm-fridge call is for the test to pay.

The steps

  1. Price the test: minutes × the value of your time.
  2. Price a warm-fridge call: a repair visit and sometimes spoiled food.
  3. Break-even chance = test cost ÷ call cost.
  4. Clean the coils too (clean the refrigerator coils and drip pan at turnover).

A worked example

Example (illustrative arithmetic, not predictions)

The test takes 3 minutes at $60 an hour: $3. A warm-fridge call costs $120. Every figure is a made-up round number.

Chance of a warm-fridge call Expected cost avoided (chance × $120) Avoided − $3
1.25% $1.50 −$1.50
2.5% $3 $0 (break-even)
5% $6 +$3
10% $12 +$9

The test pays at a 2.5% chance of a warm-fridge call: $3 ÷ $120. With an older refrigerator, it is plausible.

Close the door on a strip of paper at several points around the seal and pull it out. If it slides out without resistance, clean the seal and try again, and replace it if it still leaks.

Making it routine

  1. Close the door on a paper strip at several points.
  2. Pull it out and note any loose spots.
  3. Clean the seal and try again.
  4. Replace the seal if it still leaks.

Run your own numbers

Use the free closing net sheet below to see how small turnover costs add up against what you keep at sale.

Quick answers

What is the paper test?

Closing the door on a strip of paper and seeing whether it pulls out easily.

How do I price it?

The minutes times the value of your time.

What does a warm-fridge call cost?

A repair visit and sometimes spoiled food.

What is the break-even chance?

The test's cost divided by the call cost.

Do the numbers in this guide apply to my rental?

No. The costs and odds are made up for the example. They are not predictions.

Keep reading

Rehab budgeting

Add a Final Cleaning Line to the Rehab Budget

Learn how to price adding a final cleaning line to the rehab budget and find the forgotten-clean chance at which three minutes of work pays for itself.

· 1 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.