Sweep the Attic and Crawl Space at Turnover

By DeskTech HQ · · 1 min read

A tenant smells something in the walls a month after move-in. A crew left a bag of lunch trash in the crawl space. Nobody looked after the work. A quick sweep of the attic and crawl space at turnover takes fifteen minutes. The question is how likely a pest or odor callout is for the sweep to pay.

The steps

  1. Price the sweep: minutes × the value of your time.
  2. Price a pest or odor callout: a pest visit or a hunt for a smell.
  3. Break-even chance = sweep cost ÷ callout cost.
  4. Look for leaks while you are there (check the attic for leak stains at turnover).

A worked example

Example (illustrative arithmetic, not predictions)

The sweep takes 15 minutes at $60 an hour: $15. A pest or odor callout costs $300. Every figure is a made-up round number.

Chance of a pest or odor callout Expected cost avoided (chance × $300) Avoided − $15
2.5% $7.50 −$7.50
5% $15 $0 (break-even)
10% $30 +$15
15% $45 +$30

The sweep pays at a 5% chance of a pest or odor callout: $15 ÷ $300. After a rehab with many trades, it is plausible.

Wear a mask, gloves and a headlamp, step only on framing, bag trash and food waste and note any droppings or damage. Call a professional for pests, mold or insulation you suspect is asbestos.

Making it routine

  1. Wear a mask, gloves and a headlamp.
  2. Step only on framing.
  3. Bag trash and food waste.
  4. Call a professional for pests, mold or suspected asbestos.

Run your own numbers

Use the free closing net sheet below to see how small turnover costs add up against what you keep at sale.

Quick answers

What gets left behind?

Food wrappers, wood scraps, insulation offcuts and old materials.

How do I price the sweep?

The minutes times the value of your time.

What does a pest or odor callout cost?

A pest visit or a hunt for a smell.

What is the break-even chance?

The sweep's cost divided by the callout cost.

Do the numbers in this guide apply to my rental?

No. The costs and odds are made up for the example. They are not predictions.

Keep reading

Rehab budgeting

Add a Dump Weight Overage Line to the Rehab Budget

Learn how to price adding a dump weight overage line to the rehab budget and find the overweight-fee chance at which three minutes of work pays for itself.

· 1 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.