Checking the Take-Out Refinance: Will It Really Pay You Off?

By DeskTech HQ · · 2 min read

The borrower’s plan is simple: finish the rehab, rent the house, refinance with a long-term loan and repay you. The plan works only if the refinance is big enough. That can be tested before you lend.

The steps

  1. Payoff needed = principal + interest and fees owed at the planned refinance date.
  2. Value limit = finished value × maximum loan-to-value.
  3. Coverage limit = the loan whose payment keeps rent less taxes and insurance at or above the required ratio (for example 1.20) of the payment.
  4. Take-out amount = the smaller of the two limits.
  5. Cushion = take-out amount − payoff needed. Stress it (borrower exit plan).

A worked example

Example (illustrative arithmetic, not any lender’s rules)

Finished value $300,000, rent $2,400 a month, taxes and insurance $550 a month. Take-out rules (assumed): up to 75% of value, a 30-year loan at 7.5%, and a coverage ratio of at least 1.20 on principal and interest. Payoff needed: $162,000. Every figure is a made-up round number (rental cash flow stress test).

  • Value limit: $300,000 × 75% = $225,000. Its payment is about $1,573, and the coverage ratio is ($2,400 − $550) ÷ $1,573 = 1.18, under 1.20.
  • Coverage limit: the payment must be at most $1,850 ÷ 1.20 = $1,542, which supports a loan of about $220,486.
  • Take-out amount: the smaller, $220,486. Cushion: $220,486 − $162,000 = $58,486.
Case Value limit Coverage limit Take-out amount Cushion over payoff
Base $225,000 $220,486 $220,486 $58,486
Value 10% lower ($270,000) $202,500 $220,486 $202,500 $40,500
Rate 8.5% instead of 7.5% $225,000 $200,499 $200,499 $38,499
Rent 10% lower ($2,160) $225,000 $191,882 $191,882 $29,882
All three at once $202,500 $174,489 $174,489 $12,489

The plan pays off the loan in every case. In the worst case the cushion is $12,489, about 7.7% of the payoff, so the plan is sound but not roomy. A payoff of $190,000 would pass the base case ($30,486 of cushion) and fail the combined case.

Using the check

  1. Run it for each loan with a refinance exit and keep it in the file (approval memo).
  2. Ask for the take-out lender’s terms in writing and read the conditions.
  3. Recheck at the planned refinance date; plans age (maturity calendar).
  4. Set the loan size so the combined case still pays you off (downside test).

Run your own numbers

Use the free fix-and-flip loan sizer below to size the loan against the finished value before you test the exit.

Quick answers

What is a take-out loan?

It is the longer-term loan, often a rental refinance, that a borrower plans to use to repay the lender's short-term loan. If it does not close for enough, the short-term loan is not repaid on time.

What limits the size of a take-out loan?

Usually two things: a maximum share of the property's value, and a minimum ratio of rental income to the loan payment. The smaller of the two amounts is what the take-out lender will lend.

How should a lender test the plan?

Compute the take-out amount under the take-out lender's published rules, then rerun it with a lower value, a higher rate and lower rent. The payoff needs to be covered with room to spare.

Is a commitment letter the same as a guarantee?

No. Commitments have conditions, expiry dates and fees. Read them, and treat an unconditional commitment differently from an estimate.

Do the numbers in this guide apply to my loans?

No. The values, rent, rates and limits are made up for the example. They are not any lender's rules or a prediction.

Keep reading

Private and hard money lending

How Lenders Review a Borrower's Exit Plan

Learn how a short-term lender checks that a borrower's plan to sell or refinance will repay the loan, with a worked example and a value stress test.

· 2 min read
Private and hard money lending

A Standard Loan Package: The Loan Count Where It Pays

Learn how to compare the one-time cost of a standard loan document package with the per-loan cost of custom documents, and the loan count where it pays.

· 2 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.