Tighten Cabinet Knobs and Hinges at Turnover: The Odds
A cabinet knob that spins or a door that hangs crooked is a small thing that brings a call in the first month. A screwdriver and a few minutes at turnover fix most of them. The question is how likely a call is for the check to pay.
The steps
- Price the check: minutes × the value of your time.
- Price a later call: the call, the trip and goodwill.
- Break-even chance = check cost ÷ call cost.
- Compare with your first-month call log (the cost of turnover).
A worked example
Example (illustrative arithmetic, not quotes or predictions)
The check takes 3 minutes at $60 an hour: $3. A later call would cost $50. Every figure is a made-up round number.
| Chance a tenant calls about cabinet hardware | Expected call cost avoided (chance × $50) | Avoided − $3 |
|---|---|---|
| 3% | $1.50 | −$1.50 |
| 6% | $3.00 | $0 (break-even) |
| 12% | $6.00 | +$3.00 |
| 25% | $12.50 | +$9.50 |
The check pays at a 6% chance of a call: $3 ÷ $50. In a kitchen with older cabinets, the chance is much higher.
Open every door and drawer, tighten every knob and pull, and adjust the hinges so doors close flush. Replace knobs that spin and screws that strip, and keep a small bag of spares. Note any cabinet that is damaged beyond a quick fix.
Making it routine
- Open every door and drawer.
- Tighten knobs and adjust hinges.
- Replace stripped screws and spinning knobs.
- Note cabinets that need more than a quick fix.