Tighten the Handrail and Test the Stair Lights at Turnover

By DeskTech HQ · · 2 min read

A handrail wobbles at the top step and the stair light only works from the bottom. A tenant’s guest grabs the rail and it gives. Checking the rail and both switches at turnover takes eight minutes. The question is how likely a fall hazard or a callout is for the check to pay.

The steps

  1. Price the check: minutes × the value of your time.
  2. Price a loose rail or dark stair: a callout, and in the worst case an injury and a claim.
  3. Break-even chance = check cost ÷ cost of a problem.
  4. Fix the other stair noises too (fix squeaky doors and stairs at turnover).

A worked example

Example (illustrative arithmetic, not predictions)

The check takes 8 minutes at $60 an hour: $8. A loose rail or dark stair costs $100 in a callout. Every figure is a made-up round number.

Chance of a loose rail or dark stair Expected cost avoided (chance × $100) Avoided − $8
4% $4 −$4
8% $8 $0 (break-even)
16% $16 +$8
24% $24 +$16

The check pays at an 8% chance of a loose rail or dark stair: $8 ÷ $100. In an older house with stairs, it is plausible.

Pull on the rail along its length, flip each stair switch from both ends and fix what moves into the framing. Do not let anyone use a stair with a failing rail or no light until it is fixed.

Making it routine

  1. Pull on the rail along its length.
  2. Flip each stair switch from both ends.
  3. Fix a moving rail into the framing.
  4. Keep people off stairs with a failing rail or no light.

Run your own numbers

Use the free closing net sheet below to see how small turnover costs add up against what you keep at sale.

Quick answers

What is the check?

Pulling on the handrail along its length and flipping the stair lights from the top and the bottom.

How do I price it?

The minutes times the value of your time.

What does a loose rail or dark stair cost?

A callout, and in the worst case an injury and a claim.

What is the break-even chance?

The check's cost divided by that cost.

Do the numbers in this guide apply to my rental?

No. The costs and odds are made up for the example. They are not predictions.

Keep reading

Rehab budgeting

Add a Final Cleaning Line to the Rehab Budget

Learn how to price adding a final cleaning line to the rehab budget and find the forgotten-clean chance at which three minutes of work pays for itself.

· 1 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.