Towel Bars and Paper Holders at Turnover: The Odds
A bathroom with no towel bar or paper holder invites a tenant to drill their own. A hole in tile or a wall anchor in drywall is a repair at turnover. Fitting hardware costs a few dollars. The question is how likely drilling damage is for the hardware to pay.
The steps
- Price the hardware: the set plus minutes to fit it.
- Price repair of drilled holes: tile, drywall and paint.
- Break-even chance = hardware cost ÷ repair cost.
- Compare with the holes you patch at turnover (the cost of turnover).
A worked example
Example (illustrative arithmetic, not quotes or predictions)
The hardware costs $9 with time. Repairing drilled holes would cost $60. Every figure is a made-up round number.
| Chance a tenant drills their own holes | Expected repair cost avoided (chance × $60) | Avoided − $9 |
|---|---|---|
| 7.5% | $4.50 | −$4.50 |
| 15% | $9.00 | $0 (break-even) |
| 30% | $18.00 | +$9.00 |
| 50% | $30.00 | +$21.00 |
The hardware pays at a 15% chance that a tenant drills: $9 ÷ $60. In a bathroom with nothing on the walls, many tenants will.
Fit a bar and a holder where a tenant would want them, into studs or with proper anchors. Mount into wall studs where you can, and avoid drilling through tile where pipes may run behind it. Note the hardware in the move-in report.
Making it routine
- Check each bathroom for a bar and a holder.
- Fit them into studs or proper anchors.
- Avoid drilling where pipes may run.
- Note the hardware in the move-in report.