Unfunded Commitments: Keeping Cash Back for Draws You Owe
A lender with $1,000,000 and $600,000 lent out thinks it has $400,000 to use. It has less. Borrowers on those loans are owed rehab money that has not been sent yet, and the lender has promised it.
The steps
- Funded = balances already advanced.
- Unfunded commitments = holdbacks and other amounts promised but not yet drawn.
- Uncommitted capital = total capital − funded − unfunded commitments.
- Room for new loans = uncommitted capital − liquidity buffer.
- Check every new loan against it, and count payoffs only when received (cash planning).
A worked example
Example (illustrative arithmetic, not recommended limits)
Capital $1,000,000. Funded loans $600,000. Undrawn holdbacks $250,000. Liquidity buffer: 10% of capital, $100,000. Every figure is a made-up round number.
| Line | Amount |
|---|---|
| Total capital | $1,000,000 |
| Funded | −$600,000 |
| Unfunded commitments | −$250,000 |
| Uncommitted capital | $150,000 |
| Liquidity buffer (10%) | −$100,000 |
| Room for new loans | $50,000 |
A borrower asks for a new $120,000 loan with a $40,000 holdback. It commits the whole $120,000 at signing: uncommitted capital would fall to $30,000, below the $100,000 buffer. The test fails. The most the lender can commit to new loans is $50,000.
Timing. If 25% of the undrawn holdbacks are drawn in the next 30 days, that is $62,500 of cash out (draw schedule). The lender expects an $80,000 payoff this month. Even counting it, uncommitted capital after the new loan would be $110,000, above the buffer, but only once the $80,000 has actually arrived. Until then the loan waits, or is smaller, or is structured to be funded after the payoff.
Making it routine
- Keep a one-page commitments sheet and update it with every draw and payoff (ledger reconciliation).
- Test every new loan against room for new loans (approval memo).
- Watch the loans most likely to draw early or all at once (in-balance test).
- Report uncommitted capital to capital partners (monthly report).
Run your own numbers
Use the free fix-and-flip loan sizer below to size a loan, including the portion that will be held back for draws.