Credit Report Timing: Which Stage Costs a Lender Least?
A credit report costs a few dollars, or a few tens of dollars, and takes minutes to read. The cost that matters is when you pay it. Pulled too early, you pay for hundreds of inquiries that never become loans. Pulled too late, you spend underwriting hours on a borrower you would have declined.
The steps
- Count the deals reaching each stage: inquiry, term sheet, underwriting, closing (pipeline fallout).
- Multiply the number reaching each stage by the report fee.
- Estimate how many files at the later stages a credit review would have declined, and the hours they cost.
- Add the wasted hours to the fee total for the later options.
- Pick the stage with the lowest total, and write the policy and the authorization steps down.
A worked example
Example (illustrative arithmetic, not a fee schedule)
A quarter: 40 inquiries, 20 term sheets, 8 files underwritten, 5 closings. A report costs $35. Your time is valued at $60 an hour and underwriting a file takes 6 hours. Suppose 2 of the 8 underwritten files would have been declined on credit alone. Every figure is a made-up round number.
| Pull at | Reports | Fees | Wasted underwriting | Total | Per closed loan |
|---|---|---|---|---|---|
| Inquiry | 40 | $1,400 | $0 | $1,400 | $280 |
| Term sheet | 20 | $700 | $0 | $700 | $140 |
| Underwriting | 8 | $280 | 2 files × 6 hours × $60 = $720 | $1,000 | $200 |
The term sheet stage is the cheapest at $700. Pulling at inquiry costs twice as much for the same screening, and pulling at underwriting is cheaper in fees but loses $720 in wasted hours (minimum loan size).
The differences are small in dollars. The reasons to be careful are legal and fairness reasons, not the $700: an authorization on file before any report is pulled, the same screening for every borrower, and a clear way to explain a decision (borrower scorecard).
Making it routine
- Add the credit review step and its timing to your written underwriting policy.
- Get written authorization before pulling a report, and keep it with the file.
- Make term sheets conditional on your review, with wording checked by an attorney.
- Store reports securely and limit who can see them.
Run your own numbers
Use the free fix-and-flip loan sizer below to test a loan against your criteria before you spend on a report.