Draw Inspector Pay: Flat Fee or Per Mile?
Draw inspectors can be paid a flat fee for each visit, or a base fee plus mileage. The structures cost the same at one distance. Below it the mileage version is cheaper; above it the flat fee is.
The steps
- Take the flat fee and the base fee plus mileage rate.
- Crossing distance = (flat fee − base fee) ÷ per-mile rate.
- Compare with the distances to your properties (site visits: your own drive or a local inspector).
A worked example
Example (illustrative arithmetic, not market rates)
The flat fee is $85. The alternative is $55 plus $0.70 a mile. Every figure is a made-up round number.
| Distance to the property | Base plus mileage | Flat | Cheaper |
|---|---|---|---|
| 20 miles | $69 | $85 | Mileage, by $16 |
| 42.9 miles | $85 | $85 | Even |
| 80 miles | $111 | $85 | Flat, by $26 |
The two cost the same at about 43 miles: $30 ÷ $0.70. Properties close to the inspector are cheaper on the mileage structure, those far away on the flat fee.
For a lender with many loans in one area, a flat fee is simple. For one with loans scattered across a region, mileage can be fairer to both sides. Whichever you choose, put the terms in writing: what counts as a visit, what happens when a visit fails, and what is paid for a rush (draw inspections: cost vs overpayment saved).
Making it routine
- Map your properties against your inspectors.
- Get both pay structures in writing.
- Compute the crossing distance.
- Define a visit, a failed visit and a rush.
Run your own numbers
Use the free fix-and-flip loan sizer below to see how inspection costs fit into a loan’s profit.