Lowest Bid or Middle Bid? The Overrun Odds That Decide

By DeskTech HQ · · 1 min read

The lowest bid is the easiest to like. It can also leave out work that shows up later as change orders. The question is how likely an overrun has to be to make a higher bid the cheaper one.

The steps

  1. Compare the two bids on the same scope.
  2. Estimate the overrun the low bid could produce.
  3. Break-even chance = price gap ÷ overrun.
  4. Judge how likely the overrun is from the bid itself (comparing contractor bids).

A worked example

Example (illustrative arithmetic, not typical figures)

The lowest bid is $48,000. The middle bid is $51,000. If the low bid overruns, it adds $12,000. For simplicity, the middle bid does not overrun. Every figure is a made-up round number.

Chance the low bid overruns Expected low-bid cost ($48,000 + chance × $12,000) Middle bid saves
10% $49,200 −$1,800 (low bid cheaper)
25% $51,000 $0 (break-even)
40% $52,800 +$1,800 (middle bid cheaper)

The two cost the same at a 25% chance of overrun: $3,000 ÷ $12,000. Below that, the low bid is cheaper on average. Above it, the middle bid is.

Look at the bids for signs. A low bid with vague lines, no allowances and a short scope raises the chance. A detailed bid that matches the others line by line lowers it. A delayed job also costs holding days, which favors the contractor who finishes on time (sizing a contingency by risk).

Making it routine

  1. Put every bid on the same line items.
  2. Mark what is missing from the lowest.
  3. Compute the break-even chance.
  4. Put the winner’s scope and change-order rules in writing.

Run your own numbers

Use the free holding cost calculator below to see what a delay on the project costs each day.

Quick answers

Why might the lowest bid cost more?

It may leave out scope that shows up later as change orders.

What is the break-even chance?

The price gap between the bids divided by the size of the overrun.

Does a middle bid never overrun?

No. This guide assumes it does not to keep the arithmetic simple.

How do I lower the odds?

Compare bids line by line on the same scope and put changes in writing.

Do the numbers in this guide apply to my project?

No. The bids, overruns and odds are made up for the example. They are not typical.

Keep reading

Flip project management

Daily Site Log: The Dispute Odds That Pay

Learn how to find the chance of a contractor dispute that makes ten minutes a day on a site log over a 60-day rehab worth the time it takes.

· 1 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.