Vetting the Borrower's Contractor: What a Lender Can Check
The best loan file in the world cannot fix a contractor who takes a deposit and disappears. A lender cannot manage the rehab, but it can look at who is doing it and how they are paid.
What a lender can check
- License where one is required, and whether it is current.
- Insurance certificates for liability and workers’ compensation.
- References from recent projects, and a quick call or two.
- Lien history on past work, through a title or public-record search (title commitment).
- Price against other bids, and whether the scope is written (rehab budget review).
- Payment terms in the contract, especially any deposit.
- Workload: can the contractor staff this job on the borrower’s schedule?
A worked example
Example (illustrative arithmetic, not a recommended schedule)
A $50,000 rehab. Work is checked at four points: start (0% done), rough complete (25%), mid-project (60%) and finished (100%). Money paid beyond the value of the work done is money at risk if the contractor leaves. Every figure is a made-up round number.
| Checkpoint | Work done | Schedule A paid so far | A at risk | Schedule B paid so far | B at risk |
|---|---|---|---|---|---|
| Start | 0% | 30% | $15,000 | 10% | $5,000 |
| Rough complete | 25% | 60% | $17,500 | 40% | $7,500 |
| Mid-project | 60% | 60% | $0 | 70% | $5,000 |
| Finished | 100% | 100% | $0 | 100% | $0 |
Schedule A is 30% up front, 30% at rough complete, 40% at the end. Schedule B is 10% to start, then 30% each at rough complete, mid-project and the end, each against inspected work. The most A puts at risk is 35% of the rehab, $17,500. B’s most is 15%, $7,500. If the contractor walks at the worst moment, the lender’s collateral is $10,000 better protected under B, before any lien waivers (lien waivers).
Using the check
- Ask for the contractor’s details with the draw package, not after problems start (draw checklist).
- Prefer payment terms that follow inspected work (contractor payment schedule).
- Record what you checked in the loan file and the approval memo (approval memo).
- Have your documents reviewed so that checking a contractor does not turn the lender into the project manager.
Run your own numbers
Use the free fix-and-flip loan sizer below to size the loan and the rehab holdback together.