Wall-Mounted Door Stops at Turnover: The Hole Odds

By DeskTech HQ · · 1 min read

A door swung hard into a wall leaves a hole the shape of a doorknob. Patching it at turnover costs time and paint. A door stop costs a couple of dollars. The question is how likely a hole is, over a tenancy, for the stops to pay.

The steps

  1. Price the stops: parts plus minutes to install.
  2. Price a hole: patch, sand, prime and paint.
  3. Break-even chance = stop cost ÷ patch cost.
  4. Compare with the holes you patch at turnover (the cost of turnover).

A worked example

Example (illustrative arithmetic, not quotes or predictions)

Stops for two doors cost $6 with time. Patching a hole costs $60. Every figure is a made-up round number.

Chance of a hole over the tenancy Expected patch cost avoided (chance × $60) Avoided − $6
5% $3 −$3
10% $6 $0 (break-even)
20% $12 +$6
40% $24 +$18

The stops pay at a 10% chance of a hole: $6 ÷ $60. Behind a bathroom door or a bedroom door with a heavy knob, the chance is likely higher.

A baseboard or hinge-pin stop is easy to install and holds in drywall. Put them where the knob meets the wall, and note the stops at move-in so a tenant is not blamed for what is already there (paint touch-up or repaint).

Making it routine

  1. Look at where each door meets the wall.
  2. Install a stop where a knob would hit.
  3. Note the stops in the move-in report.
  4. Log holes patched at each turnover.

Run your own numbers

Use the free BRRRR calculator below to see how small yearly repair costs add up across a building.

Quick answers

Why add door stops?

A doorknob swung into the wall makes a hole.

How do I price them?

The stops plus the minutes to install them.

What is the break-even chance?

The cost divided by the cost of patching a hole.

Which stop is best?

A hinge-pin or baseboard-mounted stop works where the wall has no solid backing.

Do the numbers in this guide apply to my rental?

No. The costs and odds are made up for the example. They are not quotes or predictions.

Keep reading

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.