Draw Requests From the Borrower's Side: Avoid Delays

By DeskTech HQ · · 2 min read

The contractor finishes the rough-in on Tuesday. The draw request goes in on Wednesday. It comes back Friday asking for a lien waiver you did not include. The crew moves to another job. It is nobody’s fault but the paperwork, and it costs real money.

The steps

  1. Get the lender’s draw checklist before the first draw.
  2. Build each package from the checklist, the same way every time (draw checklist for lenders).
  3. Collect lien waivers when you pay, not when you request (lien waivers).
  4. Send the package when the work is ready for inspection and book the inspection early.
  5. Cost of a delay = days × daily holding cost (holding costs).

A worked example

Example (illustrative arithmetic, not a typical timeline)

A rehab holdback of $47,000 paid in four draws of $11,750. Each draw takes about 4 calendar days when the package is complete. Holding cost is $1,300 a month, about $43.33 a day, and work stops while the crew waits. Every figure is a made-up round number.

Scenario Calendar days waiting Holding cost of waiting
All four packages complete 4 × 4 = 16 $693
Two packages missing a lien waiver (+5 days each) and one inspection rescheduled (+4 days) 16 + 10 + 4 = 30 $1,300
Cost of the avoidable delays 14 days $607

A cash float. If the borrower pays each milestone from their own cash and is reimbursed by the draw, the crew never waits. A $11,750 float held for the whole 16-week project at a 10% cost of money costs about $11,750 × 0.10 × 112 ÷ 365 = $361. That is less than the $607 of avoidable delay, but it needs cash, and it does not fix a package that is wrong (cash reserve). Preparing the packages properly costs nothing.

Habits that prevent delays

  1. Use one checklist and tick it before sending.
  2. Photograph the work the day it is finished.
  3. Ask the lender how long each step takes and when inspections can be booked (lender site visit report).
  4. Track days waiting on each draw (weekly scorecard).

Run your own numbers

Use the free holding cost calculator below to price the days your own draws take.

Quick answers

Why do draws get delayed?

Most delays come from an incomplete package: a missing lien waiver, an unclear invoice, a photo that does not match the request, or an inspection that has to be rescheduled. A few come from the lender's process, which you can learn and plan around.

What should a complete package contain?

The draw form, invoices for the work being paid, lien waivers for what has been paid, current photos, and anything the loan documents list. Ask the lender for the checklist before the first draw.

What does a delay cost?

At least the holding cost of the days the work waits. It can also cost goodwill with a contractor who is waiting to be paid, or a missed crew slot.

Should I keep a cash float?

Some borrowers keep enough cash to pay a milestone and be reimbursed by the draw. It keeps crews working but ties up money, so compare the cost with the cost of delay.

Do the numbers in this guide apply to my project?

No. The draws, days and costs are made up for the example. They are not typical lender timelines or advice about any loan.

Keep reading

Flip project management

Drying Time Before Flooring: Wait or Rush?

Learn how to weigh the holding cost of waiting for a subfloor to dry against the chance of flooring failure if you rush, and the odds that favor waiting.

· 2 min read
Flip project management

Overlapping Trades: Days Saved vs Rework Risk

Learn how to weigh the days saved by letting two trades work at once against the chance that one damages the other's work, and the odds that favor it.

· 2 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.