Running Two Flips at Once: Profit per Month, Not per Flip

By DeskTech HQ · · 2 min read

One flip earns $30,000 in six months. Two flips at once should earn twice that in the same six months, and they would, if nothing slowed down. Something usually does, and the question is how much it costs.

The steps

  1. Write down one flip’s profit and the months it takes alone.
  2. Estimate the extra months each takes when run together (weekly scorecard).
  3. Subtract the extra holding cost from each flip’s profit (holding costs).
  4. Divide the total profit by the total months for each plan.
  5. Find the delay at which the two plans earn the same per month.

A worked example

Example (illustrative arithmetic, not a forecast)

Each flip earns $30,000 and takes 6 months alone. Holding cost is $1,300 a month per flip, so every extra month removes $1,300 from that flip. Sequential means one flip after the other, 12 months for two. Every figure is a made-up round number.

Plan Delay per flip Profit per flip Total profit Months Profit per month
Sequential 0 $30,000 $60,000 12 $5,000
Parallel, 2 months slower 2 $27,400 $54,800 8 $6,850
Parallel, 4 months slower 4 $24,800 $49,600 10 $4,960

If the overlap costs two months each, running together earns $6,850 a month, 37% more than $5,000. If it costs four months, it earns $4,960 and loses. The break-even is where $60,000 − $2,600 × d equals $5,000 × (6 + d), so $30,000 = $7,600 × d and d is about 3.9 months of delay per flip (profit per hour).

Money is the other limit. Two flips need about twice the peak cash, so the plan only works if both can be funded with a reserve left over (cash cycle).

The practical rule: run two when you have a way to keep each project moving, such as a reliable project manager or contractor, and a record that shows your delays stay small (choosing between deals).

Making it routine

  1. Record each flip’s planned and actual months, and note when another project was running.
  2. Use your own overlap delays to decide whether to run a second project.
  3. Check cash, insurance and lender limits before the second purchase.
  4. Review profit per month each quarter, not only profit per flip.

Run your own numbers

Use the free holding cost calculator below to price each extra month of delay on a flip.

Quick answers

Why compare profit per month instead of profit per flip?

A flip's profit says nothing about how long your cash and attention were tied up. Profit per month shows what each plan earns for the time it takes.

Why would two flips at once take longer each?

Your time is limited. Site visits, contractor calls, draws and permits compete for the same hours, so each project waits more often.

Do I need more cash to run two flips?

Yes. Peak cash roughly doubles, so check that you can fund both, with a reserve, before the second purchase ([cash timeline](/blog/flip-cash-timeline-peak-cash-needed)).

How do I estimate the overlap delay?

Use your own past flips: compare how long a flip took when you had other work going. Until you have that history, test a range of delays.

Do the numbers in this guide apply to my flips?

No. The profit, hold times and holding cost are made up for the example. They are not market data or a forecast.

Keep reading

Flip project management

List Now or Finish First? The Punch List Question

Learn how to compare the holding cost of finishing the punch list before listing with the price risk of showing an unfinished flip, and the break-even.

· 2 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.