Choosing the Loan Term: 6, 9 or 12 Months

By DeskTech HQ · · 2 min read

Every term sheet has a maturity date, and most lenders pick it by habit. The term decides how many borrowers need to ask for more time, how long your money stays out, and how soon you learn that a project is in trouble. It is worth a little arithmetic.

The steps

  1. Estimate how long borrowers actually keep the loan under each term (maturity calendar).
  2. Estimate the share who need an extension under each term.
  3. Income per loan = interest for the months held + points + expected extension fees.
  4. Annualized yield = income ÷ loan × 12 ÷ months held (effective yield).
  5. Note the work and risk each term creates.

A worked example

A $150,000 interest-only loan at 11% ($1,375 a month) with 2 points ($3,000) and an extension fee of 1% ($1,500). The hold times and extension shares are assumptions, and a longer term is assumed to let borrowers drift by a month. Every figure is a made-up round number.

Term Months held Share needing an extension Interest Expected extension fees Income Annualized yield
6 months 7 60% $9,625 $900 $13,525 15.46%
9 months 7 20% $9,625 $300 $12,925 14.77%
12 months 8 5% $11,000 $75 $14,075 14.08%

The short term has the best annualized yield here, because the money turns over sooner and the extension fees add to it. The 12-month term earns the most dollars per loan ($14,075) but ties the money up a month longer. The 6-month term brings 60% of borrowers to the table for an extension, which means more reviews, more paperwork and more chances to find a problem early. That is work, and it is useful.

Choosing

  1. Set the term near the length of the typical project plus a cushion, using your own history (borrower exit plan).
  2. Decide the extension rules and price in advance (extensions, default interest).
  3. Review the choice when your history changes (year-end loan book review).
  4. Put the term and the extension rules in the term sheet (term sheet).

Run your own numbers

Use the free fix-and-flip loan sizer below to size a loan before you choose its term.

Quick answers

What does the loan term change for a lender?

It sets when the loan matures, how often borrowers need extensions, how long money stays out, and how early a problem loan shows up. A short term creates more decisions; a long term creates more exposure.

Do borrowers repay when the term ends?

Often they repay when the project is done, which may be before or after maturity. A term set too short for the typical project produces many extension requests; one set too long may let borrowers drift.

How do extension fees affect the choice?

They add income and a point of contact, but they are not certain. A lender should count only fees it expects to collect and weigh the work of each extension.

What should drive the choice?

The typical length of the projects you finance, your own tolerance for decisions and risk, and what the borrower can reasonably complete. Check your history before you set the term.

Do the numbers in this guide apply to my loans?

No. The rate, points, hold times and extension shares are made up for the example. They are not recommended terms or a prediction.

Keep reading

Private and hard money lending

A Standard Loan Package: The Loan Count Where It Pays

Learn how to compare the one-time cost of a standard loan document package with the per-loan cost of custom documents, and the loan count where it pays.

· 2 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.