Flip project management guides

Running rehabs on time and on budget: scope, schedule, contractors and photos.

Showing 73–84 of 122

Flip project management

Pre-Inspection Dry Run vs a Failed Inspection

Learn how to weigh an hour spent walking the job before a final inspection against the re-inspection fee and delay of a failure, and when it pays.

· 2 min read
Flip project management

Punch List: Hourly Handyman or Flat Bid?

Learn how to find the number of hours at which a flat bid on a punch list costs the same as paying a handyman by the hour, with simple arithmetic.

· 1 min read
Flip project management

Rehab Contingency: Sizing the Buffer by Risk

Learn how to size a rehab contingency by the risk of each line item instead of one flat percentage, with a worked example and its effect on planned profit.

· 1 min read